Inspection and Testing

Electrical Test & Inspection Service Complying with British Standard BS7671:2018 18th Edition.

(IEE Wiring Regulations and Guidance notes)

 

 

All Employers have legal obligations under the health and safety at work Act 1974 and the Electricity at work regulations 1989 to ensure that electrical installations and equipment in places of work are safe. The Electrical Installation Condition Report (Periodic Test and Inspection) is one method of ensuring your electrical distribution system is safe.

 

Eton Contracting Solutions Ltd offers a range of testing and inspection programmes that can be tailored to suit your facility.

We only provide experienced engineers certified to City and Guilds 2380/2391 and IEE Wiring Regulations (18th Edition) Qualifications.

 

We operate under the NICEIC accreditation, who verifies all our engineers and procedures. This gives you peace of mind and confidence that our work is completed to the highest possible standards.

 

TYPES OF PREMISES TYPICAL MAXIMUM PERMITTED INTERVALS BETWEEN PERIODIC INSPECTION AND TESTING

 

Agricultural & Horticultural: 3 Years

Cinemas: 1-3 years

Theatres: 3 years

Launderettes: 1 year

Leisure complexes (not including swimming pools): 3 years

Petrol filling stations: 1 year

Places of public entertainment: 3 years

Public houses: 5 Years

Restaurants and hotels: 5 years

Swimming Pools: 1 year

 

 

 

.